BLAIR ROAD RETAINING WALL project for LAKE COUNTY

Representative project

BLAIR ROAD RETAINING WALL

Euthenics provided the engineering and surveying services required to replace approximately 430 feet of the Existing Blair Road Retaining Wall located in Perry Township, Ohio.

Project overview

Scope & delivery

Euthenics provided the engineering and surveying services required to replace approximately 430 feet of the Existing Blair Road Retaining Wall located in Perry Township, Ohio. Euthenics' services included surveying and basemapping, utility documentation and coordination, preliminary engineering, design of construction plans, preparation of the construction cost estimate, and bidding support services. Final plans were submitted at the end of 2024. The scope of work also included drainage improvements, full-depth pavement replacement within the limits of the new retaining wall, roadway resurfacing to the west approach of the Blair Road Bridge over the Chagrin River and installing new guardrail to meet current standards.

Contact

Discuss a similar project.

Contact Euthenics to discuss relevant experience, scope, and technical requirements.