CUY-EAST 75TH STREET OVER GCRTA AND NSRR
Euthenics provided engineering and surveying services for the removal and replacement of the East 75th Street Bridge over Norfolk Southern and Greater Cleveland Regional Transit Authority (GCRTA) tracks.
Project overview
Scope & delivery
Euthenics provided engineering and surveying services for the removal and replacement of the East 75th Street Bridge over Norfolk Southern and Greater Cleveland Regional Transit Authority (GCRTA) tracks. Euthenics completed a Preliminary Engineering Report and Bridge Type Study, which resulted in replacement of the existing six-span structure with a two-span continuous weathering steel girder bridge with a composite concrete deck. The approach roadway grade was raised nearly 1 foot to provide additional railroad clearance.