GATES MILLS BOULEVARD BRIDGE REPLACEMENT project for CITY OF MEDINA

Representative project

GATES MILLS BOULEVARD BRIDGE REPLACEMENT

Euthenics provided engineering and surveying services to prepare a Preliminary Engineering Report and final plans for replacement of the existing Gates Mills Road culvert and headwalls in the City of Medina.

Project overview

Scope & delivery

Euthenics provided engineering and surveying services to prepare a Preliminary Engineering Report and final plans for replacement of the existing Gates Mills Road culvert and headwalls in the City of Medina. The proposed structure was a four-sided precast concrete box culvert with a 5-foot rise and 12-foot width. Final plans were submitted in 2021.

Contact

Discuss a similar project.

Contact Euthenics to discuss relevant experience, scope, and technical requirements.