Representative project
MED-94-7.66; PID 90938
Euthenics provided engineering and surveying services to replace the existing single slab bridge with a 4 sided, 10’ x 5’ reinforced concrete box culvert with reinforced concrete headwalls, reinforced concrete turnback wingwall with the…
Project overview
Scope & delivery
Euthenics provided engineering and surveying services to replace the existing single slab bridge with a 4 sided, 10’ x 5’ reinforced concrete box culvert with reinforced concrete headwalls, reinforced concrete turnback wingwall with the invert buried 1 foot below the flowline. The project included full-depth pavement replacement and new storm sewer conduits. S.R. 94 was closed to thru traffic during construction. The project design was completed in 2020.
Contact
Discuss a similar project.
Contact Euthenics to discuss relevant experience, scope, and technical requirements.